LPG Tank Powder Spray Coating Line System 1 - 6 m/min Custom Design

Price: 800.0~1500.0 USD
Trade Term: FOB
Payment Terms: T/T,L/C,WU
skype
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Product Type: Paint 
  • Machine Type: Coating Machine 
  • Brand Name: COLO 
  • type: Coating Spray Gun 
  • weight: 45KGS 
  • coating: powder coating 
  • Use of the venue: L47m×W12m×H8.5m 
  • Material / Metal: Steel,all metallic surface 
  • Voltage: 220v/110v 
  • Power(W): 50w 
  • Certification: CE/ISO 
  • After-sales Service Provided: Overseas service center available 
  • Warranty: 1 YEAR 
  • Model No.: COLO-L 
  • Place of Origin: Zhejiang  
  • Min.Order: 1 Piece/Pieces
  • Means of Transport: Ocean, Air, Land
Supply Capacity
  • Production Capacity: 200Piece/Pieces Per Month
  • Packing:wood box or carton box
  • Delivery Date: 2-5 days
industrial spray painting equipment
1. Theproduction line consists of pre-treatment equipment, the moisturedrying equipment, spray equipment, powder curing equipment, hangingconveyor and electric control system
2. Maximum workpiece size L200×W200×H500 (mm) , Max weight ≤30kg/pcs
3.Production line speed range 1.06.0m/min
LPG Tank Powder Spray Coating Line System 1 - 6 m/min Custom Design

Theproduction line consists of pre-treatment equipment, the moisturedrying equipment, spray equipment, powder curing equipment, hangingconveyor and electric control system and so on.
Note: sewage treatment equipment, gas equipment, pre-treatment furnace owned by the user;

Design parameters (the demand side):


LPG tank powder coating
Item
Name
Design basis
1
Product name
Fire cylinders
2
Product material
Cold-rolled steel
3
The maximum thickness of the material
≤4.0mm
4
Pre-treatment
Full spraying
5
Maximum workpiece size
L200×W200×H500 (mm)
6
hanger
2 / hang (or according to the size of the workpiece)
7
Max weight
≤30kg/pcs
8
Overhead conveyors
Chain the QXT-250 Length: 350 meters,3kw two sets of drive: Tension: R600 hammer 2 sets
9
Output per day
2400hanger/8hour(assembly)
10
Working time
8hour
11
Per minute production layout space
5 hanging / min length 0.5m
12
Process speed
Process speed: 3m/min actual design: 3m/min
13
Production line speed range
1.06.0m/min
14
Moisture drying temperature
120150℃
15
Moisture drying time
8.010min
16
Before the heating source
Atmospheric pressure coal-fired water heaters: 1.0T / h
17
The moisture drying tunnel heating source
Curing bake tract waste heat
18
Spray booth
1.2galvanized sheet two sets
19
Powder curing drying tunnel heating source
Coal Stove 600,000 Kcal / h
20
Use of the venue
L47m×W12m×H8.5m
Second, the process design:
1, the production line process:
   In order to deal more effectively with steel inner and outersurfaces of the oil and phosphate treatment; pre-treatment process thespray treatment process; multi-channel washing countercurrentconnection. This keeps the the workpiece surface clean, but also savewater.
     The pre skim 2.0min60 ° C - main skim 3.0min60 of C - washing1.0min-washing-phosphate 4min60 ° C 1.0min 1.0min-table adjustment - 41.0min 1.0min-washing washing - Chit-Chat - drying (120 - 150 ° C 8min) -artificial dust - automatic spray - powder curing drying (180-220 ° Cfor 25min) - cooling - pieces
2, the production line process characteristics:
fully taken into account in the design reliability, advanced,rationality, practicality and economy, its main features are as follows:
Pre-treatment:
Thespray treatment process, rational use of production space.
Thewashed with water after degreasing and phosphating method ofcleaning using a multi-stage reverse complement, add water in and secondslopes washing the rear reservoir overflowing through the pipeline orconveyed to the front of the tank remained behind is often clean liquid,excess fluid through the front of the tank sewage discharge slot;improve the quality of cleaning but also saves water.
Theskim reservoir with a tube heat exchanger equipment, maintain bathtemperature uniformity, while accelerating effect of the workpiecesurface to remove grease.
Thespray tube with pressure regulating device the atomizing nozzle output is more stable.
sprinkler pipe connected with the competent fast-loading, maintenance, easy to install.
spray chamber body at the top of a gantry bracket, both spray shed body ribs, supply tube mount.
pre-degreasing bath, degreasing tank, phosphate bath steam tube heatexchanger heating the entire pre-treatment line reservoir are stainlesssteel plate δ2.0mm, stiffener 60 stainless steel tube and profiles canbe produced. This prevents tank corrosion, and also avoid thedeformation of the tank.
Thespray shed body made of stainless steel shed body, this can increase the life of the product.
nozzle the adjustable the sphere solid cone nozzle, Model: PY6530 type is selected.
hanging chain the QXT-250 type; VVVF drive; hammer tensioning mechanism;
Drying tunnel: the reference German technology, which is characterized by:
drying tunnel insulation board assembly of the "sandwich" structure, insulating layer of 120mm thick high-quality rock wool.
heating: fuel hot air circulation heat exchanger, hot air circulation can take advantage of the energy.
drying tunnel thermal cycling fan with low noise, high temperature,C-type connection type, the impeller 16 Meng material, built-in heatingbox. Motor class F insulation, high temperature motor.
the air supply, the next time the wind of hot air circulation, the useof positive pressure air duct conveying the Supply Duct each outletwith wind control board, uniform temperature distribution in the dryingtunnel.
Conveyor chains:
Conveyor chain selection: the QXT-250 type, pitch 250mm, hanging pitch 500mm;
drive: the cycloid reducer, variable frequency speed control mode, the power to 3kW.
Theprocess speed: V = 3m/min;
Thespeed range: 1 to 6m/min.
rails using 80 × 80 × δ3.75 closed rail the frame attached overhead strengthen, improve the wear resistance and service life.
Electric control:
Theelectrical control dispersed set of centralized control.
entire production line key electrical components selection of importedor national designated factory production of qualified products.Inverter using Mitsubishi products, other vitality of West Germany ofthe products.
u implementation of automatic detection of the temperature of each heating system, display and control.
Thetemperature sensor to connect an optional three-conductor shielded cable, improve signal interference
3,the production line process and process parameters::
item
Process name
Processing time (min)
Temperature
1
loading
2
Pre-skimmed (spray)
2.0
5060℃
3
The main skim (spray type)
3.0
5060℃
4
Washed with water 1 (spray)
1.0
Normal temperature
5
Washed with water2(spray)
1.0
Normal temperature
6
Table adjustment (spray)
1.0
Normal temperature
7
Phosphate (spray)
4.0
5060℃
8
Washed with water 3 (spray)
1.0
Normal temperature
9
Washed with water4(spray)
1.0
5060℃
10
Chit paragraph
Normal temperature
11
Moisture drying
10.0
120 150℃
13
Manual dust
14
Automatic powder coating
15
Powder curing
25.0
180 210℃
16
cool
17
Off loading

Send message to this supplier
Ms. Sally (manager)
Tel: 86-571-88194898
Mobile: +86-18957102905
Enter between 20 to 3,000 chatacters.
Contact Method
Hangzhou Color Powder coating Equipment co.,ltd
No.57 Xiangcang RD,Xihu District, Hangzhou, Zhejiang, China (Mainland)
Fax: 86-571-85335616
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center