logistic warehouse made of main steel frame multi-storey at Berlin area

Price: 1000.0 USD
Trade Term: CFR
Payment Terms: T/T
Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews
Basic Info.
  • Brand Name: HX 
  • Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil 
  • Installation: Provide full set of construction drawings and video to direct installation; 
  • Product Characteristics: 2)High strength, satisfactory property of the steel 
  • Software used: American SAP2000 American STAAD-Pro 
  • Drawing Design: dwgs Detailing by us 
  • Model No.: 1-714 
  • Place of Origin: Shandong  
  • Min.Order: 50 Metric Ton
  • Means of Transport: Land
Supply Capacity
  • Production Capacity: 9000 Ton/per Month
  • Packing:Panel accessories will be packaged in wooden box;
  • Delivery Date: 30 days

1. Data of the logistic warehouse ( made of steel frame ) :

Specification

Material :

Grade Q235 , equivalent to ASTM A36

Grade Q345 , equivalent to ASTM A572

Section :

Any product shape according to customer's requirements

Certification :

ISO quality system , Chinese GB50221 - 2001

Sand Blast :

SA 2.5 Sand blasting

Welding Technology :

Single level butt welding , fillet welding by electric arc welding , 

and Gas shielded welding

Surface treatment :

Hot dip galvanized , Epoxy zinc rich primer

Standard : ISO1461 ( 1999 ) , JIS H 8641 - 1999 , ASTM A 123 / A 123M-02

Welding Testing

Ultrasonic Testing , X-ray Testing

Manufacturing Technology

Drilling , Cutting , Assembling , Welding , Rectification , Testing etc

 

 

2. Company In Brief:

We specializes in providing complete solutions for high-quality steel structure products including: design, fabrication and erection of. Besides pre-engineered buildings, nowadays, we have developed heavy structural industry and commercial projects that aim to provide customers full structures such as workshops, warehouses, plazas, exhibition centers, supermarkets, railway stations, airports and so on …

 

With a well-trained workforce of over 1, 000 professional staffs, quality management system ISO 9001:2008, ISO 14001: 2004, OHSAS 18001: 2007 and a 200, 000 m2 factory with high technology automatic production facilities, we delivers the optimal solution, high-quality products and perfect services for your project.

Our top serviced client include SIEMENS, GE, India Adani Power, Hyundai Steel etc.

 

3. Project case- Binzhou Tianhong Steel Structure Chemical Plant, 4500 tons:

We work as subcontractor fabricated Steel Structure for Chemical Plant, project including Detail Engineer Plan, Fabrication, Steel Structure including Equipment Platform, Pipe Bridge, Tank Structure, Steel Platform, Handrail, Ladder, we also supply the Grating and Stair Treads.

The steel structure with the advantage of quickly installation, all the steel structure fabricated in workshop and delivery to the project site for installation, connected by high strength bolt, fast and easy installation greatly shorten the construction time which reduce the costs, the whole structure is easy in maintenance, which can be used for more than 50 years.

 

1) Equipment Framework

Equipment Framework bear the Equipment, Framework Structure mainly welding H Steel.

2) Pipe Bridge

Pipe Bridge mainly support the pipe, truss structure, the Angle Steel and H section steel connected by welding or bolt, the structure divide upper booms,bottom booms, web member etc.

3) Steel Platform

Steel Platform is convenient for several equipment operation, Maintenance and repair.

 

4. Drawings & Quotation for the logistic warehouse ( made of steel frame ) :

1) Customized design to welcome.

2) As long as you like, we can design and provide drawings for you. Just give the technical data and your demand, we will give you the best offer.

3) In order to give you an exactly quotation and drawings, please tell us the Length, width, eave height and local weather.  We'll quote for you prompt.

 

5. Our seaworthy packing system for logistic warehouse ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Do you provide on-site installation service for logistic warehouse ( made of steel frame ) ?

We provides customers with one-stop integrated steel building solution including installation and operation. We have 3 options for on-site installation according to the customer' s specific situation. Firstly, we offer installation instructions and installation video. Secondly, we assign the installation team for the project. Finally, we send professional engineer to guide the local installation team.

 

2) What' s your delivery time of your logistic warehouse ( made of steel frame ) ?

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.

 

 



Send message to this supplier
Mr. zhang (Vice General Manager)
Tel: 86-543-2127969
Enter between 20 to 3,000 chatacters.
Contact Method
Shandong Huaxing Steel Structure Co., LTD.
Boxing County, Binzhou, Shandong, China (Mainland) / 256500
Fax: 86-543-2127069
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center